Construction Update #1

Work is underway at last! Here is what is going on so far:
  • The slab floor has been cut for the plumbing. Guys are digging and pipes are being installed:
  • The HVAC work is in progress, with ducts going up:
  • The stairway to the upstairs offices has been rotated into its new position. This had to happen to get it out of the way of the entrance doors, which have now been installed. As of today, for the first time we have an enclosed space with doors that can be locked!
  • The landlord has started replacing the clerestory windows. The first step in this process is removing the old windows and replacing them with gorgeous plywood sheeting. This does a good job of (temporarily) blocking the natural light. Even better, we have no lighting in the space right now, since the old lights have been taken down and our nice new ones have not yet been installed. We have work lighting to get us through this dark period.
  • Eldorado's first truck arrived today and got unloaded. Here we see lots of bags of cement (for the wall texture), and the frames for the wall access doors (to get in behind the wall in a few places) on top. The initial Eldorado crew arrives on Monday to start putting stuff together!